BP to Reconnect, Resume Ops at MC252 Well
Following the passing of the weather system, the DDIII drilling rig returned to the relief well site and is taking steps necessary to reconnect with the well and resume drilling operations.
Following the passing of the weather system, the DDIII drilling rig returned to the relief well site and is taking steps necessary to reconnect with the well and resume drilling operations.